French building from hempcrete
As a thermal insulation material, plant and surface facilities has been selected hempcrete (hemp fire + lime) are gradually poured into the pre-prepared quick-timbering. Wood from all sides "flooded" hempcrete therefore excluded its interaction with air and their impact on the weather or climatic factors or harmful insects.
Stages of the construction of two-storey building hempcreteimplemented in Tours (France):
- The initial stage of the customer along with specializing in the construction of buildings of hempcrete architects not only designed the structure of the future, but also to calculate all the costs associated with its erection. The result was a 3D project with the estimate and all settlement documents;
- Transportation and unloading of timber structures, prepared in advance and assembled in the specialized construction company. The main load-bearing surfaces of walls and buildings was selected dry wood material of the relevant size and frame configurations;
- Fill light strip foundation;
- Installation of elements of the building frame;
The rendered 3D project building installation frame on a light foundation
- Assembly of predefined elements of the first floor of the building, second floor gables and roofs;
Assembling the structure of the first floor of the building and roof gables Formation
- Assembly of all structural elements of the building;
- "Fill" light load-bearing walls buildings hemp Arbolito. As a thermal insulation material, plant and surface facilities, was selected hempcrete (hemp fire + lime) are gradually poured into the pre-prepared quick-timbering. Wood from all sides "flooded" hempcrete therefore excluded its interaction with air and their impact on the weather or climatic factors or harmful insects.
Formation of the structure of the second floor exterior walls Flooding hempcrete
- Design interior partitions;
- A lining of internal communications;
Formation of the internal structures of the building
- "Layout" internal partitions by coating them with hemp plaster;
- Establish the heating system. Wood-burning stove on the first floor of the building is the only source of heat for the whole house;
Hemp plaster "Heating" all premises
Design of interior decoration premises Appearance
The project description is not specifically individual events have been included relating to land registration and preparation of relevant documentation for water, sewer, light, etc.